Wagga Base Hospital

Project: Wagga Base Hospital – New Mental Health Building
Builder: Hansen & Yuncken
Project Value: $2.5M (Approx.)
Time Frame: Approx. 8 months
Referee: Michael Martin (Project Manager) P ‐ 02 9770 7600

The new Mental Health facility is located at Wagga Wagga Base Hospital campus and consists of the construction of a new two level facility.

The new facility includes:

  • a 30 bed high dependency mental health unit to the ground floor; ‐ a 20 bed sub‐acute mental health unit to the first floor
  • accommodation as specified for the management, treatment and care of patients
  • ground and first floor link structure connecting with the main hospital building emergency department and procedures centre.

Electrical supply and installation included:

  • The complete LV power supply system Including consumer mains, sub‐mains, MSB, distribution boards, standby power, UPS system, PFC, surge protection, final sub‐circuits, related earthing systems, metering, cable trays
  • Outlets and accessories including single and multiphase socket outlets, switching systems, single and multiphase permanent connections, lighting outlets, internal and external luminaires, exit & emergency lighting system, DALI lighting control etc