New campgrounds area electrical works associated with the Equestrian Centre.
Project: CSU Equestrian Centre Campgrounds
Builder: Joss Construction
Time Frame: Approx. 3 Months
Scope of Electrical and Communications Services Works:
- Submain from Existing Sewerage Pump to new Stage 3 Distribution Board
- Custom Built Weatherproof Distribution Board
- Platinum Caravan Park Pedestals Containing Power, Lighting and Water
- Bollard Lights along Main Parade
- Streetlights atop 6m Galvanised Poles (To Match Recently Completely Equine Centre Carpark)
- Weatherproof LED Batten Fittings to Illuminate Stables and Surrounding Apron
- Underground Pit and Pipe Infrastructure for Reticulation of all Stage 2 Electrical Systems
- Provision of Underground Conduit and Pit From Stage 2 DB into Stage 3 Footprint for Connection of Future Services
- Provision of Design Documentation and Certification of all Works
View the embedded image gallery online at:
https://www.gpe.com.au/electrical-construction-projects/completed-projects/completed-low-voltage/133-csu-wagga-equestrian-centre-campgrounds#sigProId988d5b4589
https://www.gpe.com.au/electrical-construction-projects/completed-projects/completed-low-voltage/133-csu-wagga-equestrian-centre-campgrounds#sigProId988d5b4589