Current Low Voltage

Riverside Precinct


 


Project:
Riverside Precinct
Builder: Excell Gray Bruni
Client: Albury City Council
Time Frame: Approx. 12 Months

This project will transform a section of the river behind the Albury Swim Centre at Hovell Tree Park and will change the way both residents and visitors interact with the Murray River and its surrounding open space.

The scope of works for the project includes a riverside boardwalk, jetty access and mooring, BBQ and picnic areas, shade structures, precinct lighting and electrical services throughout.

Scope of Electrical and Communications Services Works:

  • WE-EF designed feature lighting throughout the precinct
  • Roadway lighting down Hovell Street
  • Switchboard Design & Construction
  • Underground conduit and cable containment
  • LV Consumer Mains and Submains
  • Power outlets to Activation Spaces
  • Lighting Control System

BOOK AN ELECTRICIAN NOW

Publish modules to the "offcanvas" position.